Provision of Ancillary Work (Electricity)

Schedule of fees

Applicable from 1st Jan 2019 to 31st December 2019 (prices exclude VAT).

Reference Meter Works Description Volume Zone A Zone B Zone C
1A Installation of New Metering System 1 phase trad £70.61 £81.20 £123.57
1B Installation of New Metering System 1 phase smart      
1C Installation of New Metering System 3 phase trad £113.01 £129.96 £197.77
1D Installation of New Metering System CT trad £198.10 £227.81 £346.67
1E Installation of New Metering System - dual fuel electricity & gas (with third party MAP)        
2A Metering System Exchange due to Faulty or Damaged Metering System 1 phase trad £59.48 £68.41 £104.10
2B Metering System Exchange due to Faulty or Damaged Metering System 1 phase smart      
2C Metering System Exchange due to Faulty or Damaged Metering System 3 phase trad £103.11 £118.57 £180.44
2D Metering System Exchange due to Faulty or Damaged Metering System CT trad £183.76 £211.33 £321.59
3A Metering System Exchange due to Functionality Change (including credit to pp & pp to credit) 1 phase trad £67.41 £77.52 £117.97
3B Metering System Exchange due to function/type Change (including traditional to smart and all exchange combinations) 1 phase smart      
3C Metering System Exchange due to Functionality Change 3 phase trad £113.01 £129.96 £197.77
3D Metering System Exchange due to Functionality Change CT trad £183.76 £211.33 £321.59
3E Metering System Exchange due to function/type Change (including traditional to smart and all exchange combinations) Smart dual fuel      
4A Metering System Exchange due to Recertification 1 phase trad £58.96 £67.80 £103.18
4B Metering System Exchange due to Recertification 1 phase smart      
4C Metering System Exchange due to Recertification 3 phase trad £101.54 £116.77 £177.70
4D Metering System Exchange due to Recertification CT trad £196.80 £226.32 £344.39
5A Repositioning of Metering System 1 phase trad £72.47 £83.34 £126.82
5B Repositioning of Metering System 1 phase smart £115.18 £132.46 £201.57
5C Repositioning of Metering System 3 phase trad £135.63 £155.97 £237.35
5D Repositioning of Metering System CT trad £196.80 £226.32 £344.39
6A Installation of Check Meter or Removal of Check Meter 1 phase trad £97.03 £111.59 £169.81
6B Installation of Check Meter or Removal of Check Meter 1 phase smart £102.77 £118.19 £179.85
6C Installation of Check Meter or Removal of Check Meter 3 phase trad £112.68 £129.58 £197.19
6D Installation of Check Meter or Removal of Check Meter CT trad £162.91 £187.35 £285.10
7A Metering System Accuracy Test 1 phase trad £104.26 £119.90 £182.46
7B Metering System Accuracy Test 1 phase smart £108.31 £124.56 £189.54
7C Metering System Accuracy Test 3 phase trad £116.68 £134.18 £204.18
7D Metering System Accuracy Test CT trad £188.98 £217.33 £330.71
8 Reset / Reprogramme Prepayment Metering System 1 phase trad £41.86 £48.13 £73.25
9A Proving Test New or Re-energised Automated Meter Reading Metering System (additional to meterwork charge) 1 phase trad / 3 phase trad £45.62 £52.46 £79.83
9B Investigate Smart Metering System Fault 1 phase smart £82.27 £94.61 £143.97
9C Investigate Smart Metering System Fault Smart dual fuel £149.39 £171.80 £261.43
10A Install a Communications Module or replace a faulty Communications Module to an AMR (ready) Metering System 1 phase trad £64.38 £74.03 £112.66
10B Install a Communications Module or replace a faulty Communications Module to an AMR (ready) Metering System 1 phase smart £64.38 £74.03 £112.66
10C Install a Communications Module or replace a faulty Communications Module to an AMR (ready) Metering System 3 phase trad £64.38 £74.03 £112.66
10D Install a Communications Module or replace a faulty Communications Module to an AMR (ready) Metering System CT trad £64.38 £74.03 £112.66
11A De-energise or Re-energise Metering System 1 phase trad £44.51 £51.18 £77.88
11B De-energise or Re-energise Metering System 1 phase smart £44.51 £51.18 £77.88
11C De-energise or Re-energise Metering System 3 phase trad £44.51 £51.18 £77.88
11D De-energise or Re-energise Metering System CT trad £44.51 £51.18 £77.88
12A De-energise and Remove Metering System 1 phase trad £48.62 £55.92 £85.09
12B De-energise and Remove Metering System 1 phase smart £64.29 £73.94 £112.51
12C De-energise and Remove Metering System 3 phase trad £65.56 £75.39 £114.73
12D De-energise and Remove Metering System CT trad £65.56 £75.39 £114.73
12E De-energise and Remove Metering System Smart dual fuel £119.88 £137.86 £209.78
13 Out of Hours Installation – Weekday (installations commencing outside of Working Hours), additional to meter work charges.   £162.91 £187.35 £285.09
14 Out of Hours Installation – Weekend (installation commencing outside of Monday to Friday hours or Bank Holidays), additional to meter work charges.   £175.95 £202.34 £307.90
15 In Hours Callout/Emergency Visit (investigate meter fault, supply interrupted, additional to meter work charges)   £98.05 £112.76 £171.59
16 Out of Hours Callout / Emergency Visit, additional to meter work charges   £126.29 £145.23 £221.01
17 Abort including where Appointments are cancelled by the Supplier within 12 Working Hours of the Site Visit   £37.41 £43.02 £65.47
18 Site Attendance with Examiner / Supplier / warrant visit (/half day or part thereof)   £260.66 £299.75 £456.15
19 Overtime Rate (additional) (/hour or part thereof)   £32.58 £37.47 £57.02
20 Collection and Return of Property Keys (more than 0.5miles and 5 minutes travel time) (additional)   £20.85 £23.97 £36.48
21 Special Site Visit and ancillary equipment work such as any additional non standard meter installation material costs including tails, connector blocks, new boards, new fuses, aerials etc.        
22 Short notice appointments (additional)   £28.67 £32.97 £50.17
23 am / pm appointments (additional)   £7.82 £8.99 £13.69
24 4 or 2 hour banded appointments (additional)   £15.63 £17.98 £27.35
25 Daily congestion charge (London)        
26 Technical Inspection Visits   £63.87 £73.45 £111.77
27 Non-technical Inspection Visits   £39.09 £44.96 £68.41

 

Zone A includes the below network areas

Eastern England UK Power Networks
South Eastern England UK Power Networks
South West England Western Power Distribution (South West)
Southern England Southern Electric Power Distribution
South Wales Western Power Distribution (South Wales)
Midlands Western Power Distribution (West Midlands)
Merseyside, Cheshire, North Wales, and North Shropshire SP Energy Networks
North West England Electricity North West

 

Zone B includes the below network areas

London London Power Networks
Yorkshire Northern Powergrid - Yorkshire
North East Northern Powergrid - Northeast
South Scotland SP Energy Networks

 

 

 

 

 

Zone C includes the below network areas

North Scotland (NOT CURRENTLY AVAILABLE)